So after several month of work done during the evening and in the week-end, I,ve finally complete my prject.
I hope that you like it. Any comments will be appreciated.
Thursday, 4 December 2014
Thursday, 13 November 2014
Monday, 10 November 2014
Moto Guzzi GSX21
Even if I'm an adept of Harley church this really makes me thinking that also the new Guzzi start to be interesting....
Monday, 3 November 2014
Mass Ride of 1 november -Snors for a cause
On 1st of November, for Movember action Pretoria chapter organized a mass ride. It was impressive, a little bit boring but, really massive! 230 bikes were there.
Here below some picture...
Here below some picture...
Monday, 27 October 2014
Sunday, 19 October 2014
Work in progress
after the chain tensioner I've also modified the carter, made some holes and then cutted the outside portion.
Finishined and installed together with the chain tensioner
Raw result installed
Finishined and installed together with the chain tensioner
Friday, 17 October 2014
Work in progress
this is how it looks the chain tensione installed just to take the measurements. need to be convered with another plate and finalized. Look ate the previous post for the history.
After I've welded 2 plate to create the space for the nut
This is the raw result installed
After I've welded 2 plate to create the space for the nut
Then I've built the cover plate and made holes
This is the raw result installed
Welding
After finishing butt weld on horizontal position now I'm working on vertical position..next week piping 45 degrees. Then it's done!
Subscribe to:
Posts (Atom)