Monday, 27 October 2014
Sunday, 19 October 2014
Work in progress
after the chain tensioner I've also modified the carter, made some holes and then cutted the outside portion.
Finishined and installed together with the chain tensioner
Raw result installed
Finishined and installed together with the chain tensioner
Friday, 17 October 2014
Work in progress
this is how it looks the chain tensione installed just to take the measurements. need to be convered with another plate and finalized. Look ate the previous post for the history.
After I've welded 2 plate to create the space for the nut
This is the raw result installed
After I've welded 2 plate to create the space for the nut
Then I've built the cover plate and made holes
This is the raw result installed
Welding
After finishing butt weld on horizontal position now I'm working on vertical position..next week piping 45 degrees. Then it's done!
Wednesday, 15 October 2014
Work in progress
I don't have a lathe, but some fantasy..So when you need to make some parts you can always think at an alternative way how to produce it. Briefly this is the sliding support for tha chain tensioner arm.
Subscribe to:
Posts (Atom)